Restarting Gold Production in Québec’s Prolific Greenstone Belt
LaFleur Minerals Inc. (CSE:LFLR, OTCQB:LFLRF) is restarting gold production in Q2-2026 in the Abitibi gold belt in the Val-d'Or region of Quebec, with strategy, infrastructure, and execution at its core, leveraging its wholly-owned gold assets: the Swanson Gold Project and the fully-permitted Beacon Gold Mill, only ~60 km apart. LaFleur is advancing its district-scale, advanced exploration project, the Swanson Gold Deposit, as a primary source of mineralized material for its production restart at the recently refurbished Beacon Gold Mill. A Preliminary Economic Assessment (PEA) led by ERM has been completed which demonstrates a vertically-integrated mine-to-mill production cycle: extracting, hauling, and processing ore within the same district, across two of LaFleur's wholly-owned assets. LaFleur's PEA outlines a capital-efficient, low-complexity development pathway leveraging the Company's 100%-owned Beacon Gold Mill and strategic CN rail access near Val-d'Or, supporting a scalable, high-return gold production profile. The PEA delivers a C$101M NPV (5%), 65% IRR at $2,750/oz gold base case, rapid 1.8 year payback period with all-in sustaining costs of $1,569/oz over a 7-year mine life. LaFleur aims to achieve production by the end of 2026 through the recommissioning of Beacon Gold Mill, sourcing mineralized material from its nearby Swanson Gold Deposit that sits on an existing mining lease. An updated 2026 Mineral Resource Estimate for the Swanson Gold Deposit includes an Indicated Mineral Resource of 2.96 Mt at 1.69 g/t Au for 160.3 koz of contained gold (30% increase from previous MRE) and an Inferred Mineral Resource of 1.08 Mt at 1.93 g/t Au for 66.8 koz of contained gold, with expansion potential through depth extensions and satellite deposits (Bartec, Jolin) targeting 1 million oz milestone. Link to PEA press release: Read the full PEA press release
The preliminary economic assessment is preliminary in nature, and it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized.